Vehicles have been rolling through the east tube of the
Stellingen tunnel in Hamburg since the 9th of December 2018.
The Stellingen tunnel is part of the new A7 cover in Hamburg and will serve in the future as noise protection for local residents in Stellingen. On Saturday, the 12.11.2018, the fire test for the first tube of the tunnel in Hamburg took place after several weeks of commissioning. The tube was opened to traffic on the 9th of December 2018.
INSOFT is also involved in the construction of the Stellingen tunnel:
- Preparation of the new HATMS tunnel control system including fully integrated operation of the traffic systems
- Preparation of the H-PLC control software
- Integration of all functions into the SPS/PLC system
- Utilisation of modern Windows 10, Windows 2016 Server, operating systems
- Eplan P8 hardware planning and electrical switchgear construction